![]() Crossing out original details and updating information by hand is recommended, so that anyone can see exactly what was initially planned and where, why and how changes were made.Exact details of changes, additions or eliminations of previous design elements, such as sizing, materials, dimensions, installation are included.When handling as-built drawings, some things to keep in mind are: Though they are technically different and are created by architects or contractors, these terms can be used interchangeably.Īs-built drawings contain important data, so every construction site must have at least one set. They can be called ‘as-builts’, ‘red-line drawings’ or ‘record-drawings’. ![]() They document all changes made during construction that differ from the original agreed-upon design. The 2D floor plans typically include details of walls, doors, windows and plumbing fixtures. As-built drawings show all changes made to the original design and the actual dimensions, geometry and location of all project components. As-built drawings are the latest, revised set of drawings submitted by a contractor to the owner after project completion.
0 Comments
Leave a Reply. |